The project
Air-to-water heat pump with condensing gas boiler for peak loads — adsorption dehumidification of the basement rooms.
| Location | Chur |
|---|---|
| Year | 2019 |
| Scope | Heating · Plumbing |
| Size | 13 apartments |
What we designed
The engagement covered Heating · Plumbing. Everything was designed from Landquart and coordinated across all trades involved. Where several disciplines sit with one office, conflicts between routing paths get resolved internally instead of in meetings.
A comparable project?
We're glad to show how the approach transfers to your building — with figures for equipment
size, space requirements, and operating cost rather than rules of thumb.
Ihr Projekt besprechen
Ein kurzes Gespräch genügt, um den Rahmen abzustecken — Umfang, Termine und Honorar. Wir melden uns in der Regel innert eines Arbeitstags.
Anfrage senden or 081 377 80 80